Containerized LNG could be the latest product to be manufactured at the Skeena Industrial Development Park in Terrace. (Taisheng International Investment Services photo)

Chinese firm proposes LNG processing plant near Terrace

Project to be located within the Skeena Industrial Development Park near airport

A Chinese distributor of liquefied natural gas wants to build a processing facility near Terrace, next to the regional airport.

Top Speed Energy sent a letter to area residents on Oct. 16, seeking feedback on a facility that could process 150,000 tonnes of LNG per year – about 0.6 per cent of what’s manufactured at LNG Canada’s multi-billion-dollar facility in nearby Kitimat.

The project is small enough for the company to bypass federal and provincial environmental assessments, the letter said. It will instead submit a permit application to the BC Oil and Gas Commission and any required applications to the City of Terrace.

The facility would receive natural gas from a nearby pipeline, and then transport the finished product by truck to a terminal in Prince Rupert and on to domestic and international markets.

The number of containers is expected to be handled within the terminal’s existing capacity, and “is not a driver for terminal expansion,” said the letter, signed by Clark M. Roberts, the CEO of the firm’s Canadian arm, based in Burnaby.

The 1,187-acre plot of land, in a business park next to the Northwest Regional Airport, was bought in 2014 by Taisheng International Investment Services, which later signed a development agreement with the city. No additional roads will be built.

Residents and organizations have until Nov. 6 to send in written feedback. They can also request a meeting with the company.

This isn’t TSE’s first jump into LNG exports from B.C. to Asian markets. FortisBC, a utility company operating a liquefaction facility on the Fraser River near Vancouver, signed Canada’s first long-term supply agreement to produce LNG for export to China with TSE in July.

Under the two-year agreement, 53,000 tonnes of LNG will be shipped from the Tilbury facility in B.C. to China by summer 2021.

READ MORE: FortisBC eyes expansions after inking deal to send LNG by container to China

READ MORE: Pacific Northern Gas moves to reinstate full capacity and expand pipeline

TSE LNG Facility Letter by Brittany Gervais on Scribd

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Stop checks, searches of Wet’suwet’en pipeline opposers unlawful: Watchdog

Wet’suwet’en hereditary chiefs, the B.C. Civil Liberties Association, Union of B.C. Indian Chiefs file complaint

Wet’suwet’en pipeline supporters speak up

“Protesters get one side of the story and they stand up with their fists in the air.”

UNBC hosting regional Moose Hide Campaign Gathering

The event is a part of a movement to stand up against violence inflicted on women and children

Coastal GasLink pipeline investor committed to closing deal despite protests

Developer TC Energy Corp. — formerly TransCanada Corp. — is to remain the operator of the $6.6-billion pipeline

Caledonia Sled Race organizer says volunteers from the community make the race possible

The Caledonia Classic Sled Races marked their silver jubilee this year

Blair says RCMP have met Wet’suwet’en conditions, calls for end to blockades

The Wet’suwet’en’s hereditary chiefs oppose the Coastal GasLink project

Petition seeks to remove local police department from Lindsay Buziak murder case

American woman starts online petition in hopes of helping Buziak family

Health officials confirm sixth COVID-19 case in B.C.

Woman remains in isolation as Fraser Health officials investigate

Study says flu vaccine protected most people during unusual influenza season

Test-negative method was pioneered by the BC Centre for Disease Control in 2004

Saskatchewan and B.C. reach championship round at Scotties

British Columbia’s Corryn Brown locked up the last berth in Pool B

B.C. lawyer, professor look to piloting a mental-health court

In November, Nova Scotia’s mental-health court program marked 10 years of existence

COLUMN: Not an expert on First Nations government structures? Then maybe you should calm down

Consider your knowledge about First Nations governance structures before getting really, really mad

One dead in multi-vehicle collision involving logging truck on northern B.C. highway

DriveBC says highway expected to remain closed until 8 p.m.

B.C. teacher gets 15-year ban after lying about having sex with just-graduated student

Teacher had been dishonest with the B.C. Commissioner for Teacher Regulation

Most Read