Premier Christy Clark and BC Hydro CEO Jessica McDonald announce main contractor for Site C dam construction at a BC Hydro substation in Burnaby Wednesday.

Contractors picked for Site C construction

Samsung of Korea, ACCIONA of Spain and Petrowest to sign BC Hydro's biggest-ever construction contract for Peace River dam

BC Hydro has selected its main contractor to construct the third dam on the Peace River, and is finalizing a $1.5 billion contract for a dam and river diversion that is the largest in the utility’s history.

The three members of Peace River Hydro Partners are Korean engineering and electronics giant Samsung, Spanish dam and infrastructure specialist ACCIONA and Petrowest Corp., a Calgary-based company that has expanded from oil and gas construction to large infrastructure in northeast B.C. and Alberta.

Petrowest and ACCIONA worked on the recently completed Fort St. John hospital, and ACCIONA has built hydro dams in Spain and Chile. Samsung has built hydro dams, roads, buildings, tunnels, bridges and airports.

Energy Minister Bill Bennett said the contract will be for a fixed price to build the main “civil works,” which include excavation, river diversion tunnels, intake and outlet structures, a kilometre-long earth-filled dam, a 70-metre-high concrete buttress and a road network.

Bennett said work can proceed in winter, and he is confident BC Hydro can stay within its estimated project cost of $8.3 billion.

When the decision to proceed was made a year ago, oil and gas activity was high and there were concerns about labour shortages. But with a continuing slump in oil, natural gas and mineral prices, there are idled workers and equipment in Fort McMurray and other sites in Western Canada.

“Mining is really slow right now and LNG has not yet taken off, so you actually have almost a perfect circumstance for BC Hydro to be entering into its major contracts on Site C,” Bennett said.

Petrowest CEO Rick Quigley said the project will hire locally first, from around B.C. second and elsewhere in Canada third before looking outside the country for skilled labour.

BC Hydro also identified Peace River Hydro Partners’ labour agreements with Christian Labour Association Canada and Construction Maintenance and Allied Workers’ Canada, which broke away from the U.S. international carpenters’ union in 2007.

B.C. Building Trades executive director Tom Sigurdson issued a statement protesting the choice.

“Premier Clark has long said that B.C. workers should be the first in line for Site C work,” Sigurdson said. “This has not been the case so far under the first major contract, awarded to a large Alberta company which has one of four workers on site from out of province.”

 

Just Posted

North Road proposal draws heat

Public meeting to address Canfor request

First farmers market fosters a sense of community

Vendors and customers alike excited for return of market

Chief Dr. Robert Joseph awarded Order of Canada

An inspiration and role model for all Canadians

Workshop to help businesses find that perfect employee

Selling location and lifestyle one strategy for success

National ecology expert holds workshop in Fort St. James

Use of natural materials vital for environmental restoration

Police release video on how to ‘run, hide, fight’ if there’s an active shooter

Vancouver police offer video with input from E-Comm, BC EHS, Vancouver Fire and Rescue

Horgan defends fight to both retain and restrict Alberta oil imports

Alberta says pipeline bottlenecks are kneecapping the industry, costing millions of dollars a day

RCMP caution boaters after two kids pass out from carbon monoxide poisoning

Both children were given oxygen and taken to hospital

Barkerville opens for the season

Highlights of Barkerville’s upcoming season include 150th Dominion Day and pack train re-creation

B.C. invests $115M to create 200 new nurse practitioner jobs

Health Minister says 780,000 B.C. residents don’t have a family doctor

Supreme Court rules social housing residents in B.C. deserve rights too

Tenants trying to stabilize their living situations should not face less legal rights than those paying market rates: Judge

Union calls on prime minister to step into ‘stalled’ Phoenix compensation talks

For more than two years, thousands of federal workers have been affected by Phoenix system

Judge: President Trump can’t block critics on Twitter

The judge had suggested that Trump mute rather than block some of his critics

NFL owners adopt new policy to address anthem protests

Commissioner Roger Goodell said the change was approved unanimously by owners

Most Read