Satellite image taken the day after Mount Polley mine tailings breach shows drained tailings dam and spill that backed into Polley Lake and down Hazeltine Creek to Quesnel Lake.

Mine dam inspections ordered across B.C.

Independent engineering inspections have been ordered for Mount Polley mine and nearly 100 other mine tailings ponds

Independent engineering inspections have been ordered for Mount Polley mine near Williams Lake and nearly 100 other mine tailings ponds with permits across the province, with reports to be complete by the end of January.

Energy and Mines Minister Bill Bennett announced the dual reviews Monday. The Mount Polley investigation is to be complete by Jan. 31 and will be done concurrently with the B.C. government’s legally required probes by B.C.’s chief inspector of mines and the environment ministry, which looks at the longer-term effects of the Aug. 4 tailings spill.

Bennett said costs will be covered by Imperial Metals for Mount Polley and by all operators of mines with permits to operate nearly 100 tailings facilities in B.C.

“Certainly in the last 40 years there’s no evidence of a tailings dam breach in British Columbia, but rare or not, it happened, and so the public’s confidence I think is shaken” Bennett said at a news conference in Vancouver. “That’s why we need to get these three experts involved as quickly as we’re getting them involved.”

The Mount Polley panel includes UBC mine engineering professor Dirk Van Zyl, U.S. consulting engineer Steven Vick, whose earlier investigations included the 2005 New Orleans levee breach that followed Hurricane Katrina, and Norbert Morgenstern, an Alberta civil engineering professor who has worked on 140 mine projects.

Bennett said the panel was chosen with approval of the Williams Lake and Soda Creek Indian Bands, and their report will be made available to the band councils at the same time as government.

Independent inspections of other mine tailings ponds must be completed Dec. 1, a change from the March 31 deadline for inspections that are required annually. Bennett said these inspections will each have to be reviewed by an independent geotechnical engineering firm.

 

Just Posted

‘Summer from hell’: vandals rob community garden following devastating wildfire season

The community rallied to keep the Health Minds Community Garden open in Fort St. James

College of New Caledonia offers new automotive glass technician program

The program is offered mainly online, allowing more students to take part from across the north

Decision on Burns Lake’s workforce camp “pending very soon”: Coastal GasLink

Meetings to discuss new camp location postponed due to wildfire situation

B.C. parents leery of HPV cervical cancer vaccine

Provincial registration uptake among lowest in Canada

Municipal spending outpaces population growth 4-fold in B.C.: report

Canadian Federation of Independent Business has released its annual operational spending report

Environment Canada confirms Ottawa area hit by two tornadoes Friday

At one point more than 200,000 hydro customers were blacked out

Whitecaps see playoff dreams fade after 2-1 loss to FC Dallas

Goal in 87th minute seals Vancouver’s fate

B.C. students send books to displaced students of Hornby Island school fire

Maple Ridge elementary school teacher says students learned about acts of kindness

Trump drains oxygen from Trudeau foreign policy with PM, Freeland bound for UN

A lot has changed since the Liberals came to power in Canada in 2015

B.C. man fined $15,000, barred from trading securities for fraud

Larry Keith Davis used money from an investor to pay personal bills

Emergency crews investigate small sulphuric acid spill in Kootenays

IRM states a small volume of less than one cup and three dime-sized drips were leaked from carrier

Family, friends of B.C murder victim want killer sent back to max security facility

Group wants convicted murderer Walter Ramsay sent back to a maximum security facility

Most Read